This job was a 1MW ground mounted solar PV array in a field approximately half a mile from the nearest road. The grid connection was at 11,000V and required us to provide an incoming HV Ring Main Unit, HV/LV transformer and LV switching to G59/2 regulations. We were also required to provide the "accommodation" for the DNO's "edge of park" HV switch which would be some 20 metres from the base of their pole and 50 metres from our transformer and switch room. As this job was in Mid Wales the DNO was Scottish Power Energy Networks who are possibly one of the few remaining DNO's who insist on a brick built sub-station enclosure with a cast concrete roof over. (Nick-named the Mausoleum). Had we been "over the border" in Western Power's area then we would have been able to use a pre-fabricated double walled insulated fibreglass sub-station which is considerably easier to install and lower cost to our client. The first job was to mark out the site in accordance with the Planning Consent before excavating the base for the sub-station which is 1 metre deep. Casting the base in situ with substantial steel reinforcement followed before we could start to bring up the walls and cabling channels.